
Site Map and Downloadable Documents
Polywrap Products Additional Products Contact Us
ANSI/AWWA C105/A21.5 INSTALLATION
METHOD A

In this method, which is preferred by most utilities and contractors, one length of polyethylene tube, overlapped at the joints, is used for each length of pipe.
Return to Install Instructions
See Method A for Normal Dry Trench Conditions
Repcor, Inc. 11518 N. Port Washington Rd. PO Box 404 Mequon, WI 53092-0404
Phone: 262-241-5900 Fax: 262-241-5376
Email: repcor@sbcglobal.net
© Repcor, Inc. 2005 Last Revision: February 2010