Site Map and Downloadable Documents  

Polywrap Products     Additional Products     Contact Us

 

ANSI/AWWA C105/A21.5 INSTALLATION

METHOD A

In this method, which is preferred by most utilities and contractors, one length of polyethylene tube, overlapped at the joints, is used for each length of pipe.

Return to Install Instructions

See Method A for Normal Dry Trench Conditions

See Method B

See Method C

 

 

Repcor, Inc.   11518 N. Port Washington Rd.   PO Box 404   Mequon, WI  53092-0404

 

Phone:  262-241-5900    Fax:  262-241-5376

Email:  repcor@sbcglobal.net  

© Repcor, Inc. 2005    Last Revision:  February 2010